The Reno Diary

Kitchen reno gone wild

Rob

Week 110: Slab prep and sewer!

January 29, 2023 by Rob 2 Comments

I know that things have been moving along the entire project but it is much more visible now and it really feels like there is momentum. The changes are visible and i really understand how they move us all forward. Maybe that is my wishful thinking because we now have to be in by April 1st. Every day counts. Monday we passed our plumbing inspection. We had the wrong … [Read more...] about Week 110: Slab prep and sewer!

Week 109: Plumbing & Flooring

January 29, 2023 by Rob 2 Comments

The start of the week the team finished up the roof decking so the dining area is now enclosed. The problem is that the weather has be wet so the roofing guy has been delayed so we didn't get the actual roofing done. For now we have covered it with a tarp and we are hoping for better weather and for the roofing guy to catch up on his backlog. Dean really wants to get the … [Read more...] about Week 109: Plumbing & Flooring

Soundproofing

January 15, 2023 by Rob 1 Comment

One of our big concerns with the suite is noise. Sarah is a light sleeper so we don't want a ton of noise coming up through the floor, and we have old wood floors built directly on the subfloor with none of the cushioning required in new builds to deaden the footfall noise going down. I also like a bit of volume on my Fatboy Slim so we want a decent amount of soundproofing … [Read more...] about Soundproofing

Week 108: More roof & plumbing details

January 14, 2023 by Rob 1 Comment

It was another busy week working on the addition. At the start of the week we got the big beam we needed to put in to support the gap where we are taking out the wall. Naturally this was more effort than expected because of some of the funky building techniques from the 1920's but that is why we have reciprocating saws and it was put to good use. I felt a little bad that i … [Read more...] about Week 108: More roof & plumbing details

Week 107: Rafters

January 8, 2023 by Rob 1 Comment

It was only a 4 day week but the team put it to good use and the rafters are almost done for the dining area. Because we have a cathedral ceiling in there, and almost 100 years have passed since the house was built, the roof structure is quite different so Dean was sorting out how to align everything. It will be quite a thick roof because it needs insulation and venting. … [Read more...] about Week 107: Rafters

« Previous Page
Next Page »

Primary Sidebar

Follow Us!

  • Facebook
  • Instagram
  • Pinterest
  • YouTube

More to See

Week 114: Short but Suite

February 26, 2023 By Rob

Oh dear. Sorry about that title. I must be … [More...] about Week 114: Short but Suite

Week 113: Sweet Suite Framing

February 20, 2023 By Rob

Things got rolling with the framing this week … [More...] about Week 113: Sweet Suite Framing

Categories

  • Mechanical (1)
  • Planning (13)
  • Progress Report (99)
  • Random (15)

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Footer

About the Blog

A personal blog for Rob & Sarah to document the renovation of our 1929 east Vancouver home. Follow along as we replace the foundation, put on an addition, renovate the kitchen, and add a deck on a tight budget.

Recent

  • Week 115: Everything Everywhere All at Once
  • Week 114: Short but Suite
  • Week 113: Sweet Suite Framing
  • Week 112: Slab and lockable doors
  • Week 111: Ready to pour the slab

Search

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in