June 22, 2021 by Rob Leave a Comment

I spent Monday and Tuesday mostly mopping and cleaning up after stripping the ceiling because my father was moving this weekend and i was going to Victoria to help a bit. With Sarah getting home next week i had a lot on my plate to make the place tidier. It was nice to get on my bike and get away for a bit even if moving and unpacking isn’t the most relaxing thing. It was great to see my father, sister, and sister in law in person instead of WhatsApp and to be able to hug family. Dad has had both his shots and the rest of us had our first shots more than 3 weeks ago. It almost felt normal. He had hired professionals to do the pack and move so it wasn’t too bad. We had some good meals and a few beers among the boxes.

The only real work on the reno we did was some back and forth with the architect about the size of the front patio. We had raised it as a concern earlier but had never asked for dimensions. Now that the plans are going in for preliminary approval and everything else is sorted (except maybe those extra windows) it became that last detail we had to get sorted.

Innes the architect had planned it as 13.5′ with a path in front putting it 16 feet out into the front yard. I measured it out with stakes and took some photos for Sarah so we could get a sense of it and realized that a patio that size will take up the majority of the front yard. I know we are planning on sharing our space with tenants but we hadn’t planned on losing the entire yard. We are hoping to be able to keep some lawn and garden out there. We sent Innes our concerns and settled on a 9 ft deep patio. We are still considering the path and will likely have it right beside the patio with the garden bed on the south side of it rather than between the path and the patio.

Original idea on the left with our revision on the right. Not sure about the garden bed between the path and the patio but that can come later.

Filed Under: Planning, Progress Report

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Follow Us!

  • Facebook
  • Instagram
  • Pinterest
  • YouTube

More to See

Week 114: Short but Suite

February 26, 2023 By Rob

Oh dear. Sorry about that title. I must be … [More...] about Week 114: Short but Suite

Week 113: Sweet Suite Framing

February 20, 2023 By Rob

Things got rolling with the framing this week … [More...] about Week 113: Sweet Suite Framing

Categories

  • Mechanical (1)
  • Planning (13)
  • Progress Report (99)
  • Random (15)

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Footer

About the Blog

A personal blog for Rob & Sarah to document the renovation of our 1929 east Vancouver home. Follow along as we replace the foundation, put on an addition, renovate the kitchen, and add a deck on a tight budget.

Recent

  • Week 115: Everything Everywhere All at Once
  • Week 114: Short but Suite
  • Week 113: Sweet Suite Framing
  • Week 112: Slab and lockable doors
  • Week 111: Ready to pour the slab

Search

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in