Week 65: Tree Barrier’s and More Suffering

March 27, 2022 by Rob Leave a Comment

In the interest of not killing myself trimming drywall i got back outside for a bit and finally finished up the tree barriers. It always amazes me how long some of this stuff takes with measuring and cutting and figuring things out. I guess the pros have a system but Ric and i banged in the posts where it was convenient to not damage plants and we didn’t exactly square everything off. I am also using salvaged lumber for the most part so trying to optimize the pieces is another DIY time waster. I think what i had originally planned for a light morning took most of the day

I also spent more time in the basement cutting down drywall. I have learned to do this in sessions of about 90 minutes each with a break between tackling another job or sometimes just collapsing. The challenge with nasty jobs like this though is that you have to get all geared up and you get so dusty doing it, that you need to shower afterwards. For efficiency i just want to keep going but i just can’t. It is also not the sort of job you can just do when you have a spare 10 minutes like you can with a typical crowbar job. This can’t end soon enough.

The dust gets everywhere. I have to fight my instinct to save $ and remember to replace my Dremel blades as it makes a huge difference
this gave me a much greater sense of accomplishment than i expected. it feels like a milestone

In amongst the sessions of gross work i also got another load of garbage off to the dump. Demolition continues in various corners of the basement and Sarah is digging up plants, packing, and prepping for an interview for a permanent job on Friday. Amongst all of that we are also packing and labelling for the container being delivered Monday and moving next weekend.

Previous: Week 64: Hazmat inspection and a step back

How did we get here?
Week 1

Next: Week 66: Everything is Happening!

Filed Under: Progress Report

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Follow Us!

  • Facebook
  • Instagram
  • Pinterest
  • YouTube

More to See

Week 114: Short but Suite

February 26, 2023 By Rob

Oh dear. Sorry about that title. I must be … [More...] about Week 114: Short but Suite

Week 113: Sweet Suite Framing

February 20, 2023 By Rob

Things got rolling with the framing this week … [More...] about Week 113: Sweet Suite Framing

Categories

  • Mechanical (1)
  • Planning (13)
  • Progress Report (99)
  • Random (15)

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Footer

About the Blog

A personal blog for Rob & Sarah to document the renovation of our 1929 east Vancouver home. Follow along as we replace the foundation, put on an addition, renovate the kitchen, and add a deck on a tight budget.

Recent

  • Week 115: Everything Everywhere All at Once
  • Week 114: Short but Suite
  • Week 113: Sweet Suite Framing
  • Week 112: Slab and lockable doors
  • Week 111: Ready to pour the slab

Search

Tags

bank basement character home dining room DIY financing house lift kitchen kitching mortgage mortgage broker movie new foundation reno renovation suite table Vancouver

Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in